Hotmix Asphalt AC-BC & AC-WC Patching
± 1,800 m² (Dispersed Patching Spots)
4 Calendar Days
About the Project
Employing cold-milling saw cutting, debris extraction, emulsion tack coat, and rapid roller compaction with flush seamless joints.
Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.
Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.
Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.
Technical Specifications & Machinery
layersMain Materials Used
- check_circleAsphalt Saw Blades
- check_circleHigh-Temperature Hotmix
- check_circleTack Coat
precision_manufacturingHeavy Machinery Deployed
- buildAsphalt Cutter
- build2-Ton Baby Roller
- buildTamper Compactor
fact_checkQuality Control Standards
- verified_userFlush Seamless Jointing
- verified_userZero Tire Bump Impact
Anti-Settling Joint Warranty
Related Projects & Works

Cluster Kucica Residential Paving
Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

Cluster Cikini 3 Residential Paving
Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

Sector 3 Main Road Paving
Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.
Need Similar Asphalt Paving Work?
Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.