Logo PT Rizal Jaya Construction
Main Roads & ArterialsStatus: Completed on Schedule

Sector 2-3 & 9 Main Road Patching (2025)

location_onArterial Corridors Sector 2, 3, and 9 Bintaro Jaya

Sector 2-3 & 9 Main Road Patching
Final Field Documentation

Sector 2-3 & 9 Main Road Patching

location_onProject Location

Arterial Corridors Sector 2, 3, and 9 Bintaro Jaya

apartmentClient / Developer

Bintaro Jaya

layersMaterial Type

Hotmix Asphalt AC-BC & AC-WC Patching

square_footEstimated Area

± 1,800 m² (Dispersed Patching Spots)

scheduleExecution Duration

4 Calendar Days

Scope of Work

About the Project

Rapid-maintenance asphalt program remedying potholes and localized subgrade depression across high-traffic intersections.

Employing cold-milling saw cutting, debris extraction, emulsion tack coat, and rapid roller compaction with flush seamless joints.

Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.

verifiedPrime Compaction Control

Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.

water_dropElevation & Water Runoff

Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.

SPECIFICATION DATA

Technical Specifications & Machinery

layersMain Materials Used

  • check_circleAsphalt Saw Blades
  • check_circleHigh-Temperature Hotmix
  • check_circleTack Coat

precision_manufacturingHeavy Machinery Deployed

  • buildAsphalt Cutter
  • build2-Ton Baby Roller
  • buildTamper Compactor

fact_checkQuality Control Standards

  • verified_userFlush Seamless Jointing
  • verified_userZero Tire Bump Impact
workspace_premium
Quality Warranty & Guarantee

Anti-Settling Joint Warranty

Similar References

Related Projects & Works

View All Projectsarrow_forward
Cluster Kucica Residential Paving
Bintaro Jaya

Cluster Kucica Residential Paving

Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

View project details→
Cluster Cikini 3 Residential Paving
Bintaro Jaya

Cluster Cikini 3 Residential Paving

Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

View project details→
Sector 3 Main Road Paving
Bintaro Jaya

Sector 3 Main Road Paving

Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.

View project details→
handymanFREE TECHNICAL CONSULTATION & SITE SURVEY

Need Similar Asphalt Paving Work?

Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.