Logo PT Rizal Jaya Construction
Residential PavingStatus: Completed on Schedule

Maleo RT 08 Residential Paving (2026)

location_onMaleo RT 08 Residential Area, Bintaro Jaya Sector 9

Maleo RT 08 Residential Paving
Final Field Documentation

Maleo RT 08 Residential Paving

location_onProject Location

Maleo RT 08 Residential Area, Bintaro Jaya Sector 9

apartmentClient / Developer

Bintaro Jaya

layersMaterial Type

Hotmix Asphalt AC-WC

square_footEstimated Area

± 2,400 m²

scheduleExecution Duration

4 Calendar Days

Scope of Work

About the Project

Upgrading neighborhood roads in Maleo RT 08 from aged, dusty pavement to modern, smooth municipal-grade hotmix asphalt.

Carried out with active community support and tight technical oversight, resulting in a safe, clean, and puddle-free neighborhood road.

Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.

verifiedPrime Compaction Control

Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.

water_dropElevation & Water Runoff

Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.

SPECIFICATION DATA

Technical Specifications & Machinery

layersMain Materials Used

  • check_circleHotmix Asphalt AC-WC
  • check_circleTack Coat Emulsion

precision_manufacturingHeavy Machinery Deployed

  • build2-Ton Baby Roller
  • buildCompact Tandem Roller
  • buildManual Paving Tools

fact_checkQuality Control Standards

  • verified_userResidential Smoothness Test
  • verified_userNeat Boundary Curb Finishes
workspace_premium
Quality Warranty & Guarantee

Community Workmanship Warranty

Similar References

Related Projects & Works

View All Projectsarrow_forward
Cluster Kucica Residential Paving
Bintaro Jaya

Cluster Kucica Residential Paving

Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

View project details→
Cluster Cikini 3 Residential Paving
Bintaro Jaya

Cluster Cikini 3 Residential Paving

Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

View project details→
Sector 3 Main Road Paving
Bintaro Jaya

Sector 3 Main Road Paving

Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.

View project details→
handymanFREE TECHNICAL CONSULTATION & SITE SURVEY

Need Similar Asphalt Paving Work?

Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.