Road Paving Cost Per Meter: Key Pricing Factors & Detailed Project Budget (RAB)

Tim Teknis RJC
Tim Teknis RJC
Asphalt Paving & Infrastructure Specialist
Perencanaan RAB dan Estimasi Biaya Pengaspalan Jalan

Developing an accurate road paving budget (Bill of Quantities / RAB) requires thorough knowledge of site preparation, aggregate base layers, prime/tack coats, and final hotmix compaction. This guide explains key cost components per meter to ensure cost-efficiency and structural longevity.

Core Cost Components in Road Paving Budgets

  1. Site Preparation & Cleaning: Clearing dust, soil, and vegetation using industrial compressors and graders.
  2. Aggregate Sub-Base & Base Course: Laying and compacting crushed stone to achieve required California Bearing Ratio (CBR) soil capacity.
  3. Bond Coat Application (Prime & Tack Coat): Spraying liquid emulsion binder to chemically lock the hotmix to the subgrade.
  4. Hotmix Paving & Dual Compaction: Mechanical paving with asphalt finishers, followed by heavy tandem and pneumatic tire rollers.

Explore our full scope of civil infrastructure services in our road paving and infrastructure service overview.

Need a Formal Project Budget Quotation?

Consult our engineering estimators today for a free on-site survey and tailored budget breakdown.

Request Project Budget
Paving BudgetCost Per MeterRoad PricingProject Estimation